A 350-metre road in Maaroub has been paved after soil and rubble were cleared and the surface was excavated and levelled. A 150-metre stone retaining wall was also built to support and protect the road. Source: Amal Baladi, 2 Nov 2026
Fixed, as announced in the news. Amal Baladi, 2 Nov 2026
Affected
1
people say this affects them
Watch this issue
Save this to your watchlist and stay updated as it moves.