Before
After the repair
Hourani road is Clemenceau Beirut is a step downward sloping road that had a sewage issue that was resolved. The road went through construction to fixed it but is was left with a major problem and was not finished. The road is getting worse and is a major slip risk of left with no asphalt.
Affected
16
people say this affects them
Watch this issue
Save this to your watchlist and stay updated as it moves.
Since July!!
Status timeline
Submitted
23 Jul 2026
A resident filed this report.
Published
5 Aug 2026
Baladi Map reviewed this report and made it public.
16 residents affected
Residents who say this affects them.
In progress
Work is underway on the ground.
Repair reported
11 Oct 2026
A photo of the repair was sent and checked.
Confirmed fixed
12 Oct 2026
Baladi Map checked the photo and published this as fixed.