Baladi Map checked this report and confirmed who is responsible for it.
After the repair
The well near the Husseiniya in central Souwaneh was deepened by 150 metres, cleaned and equipped for pumping. Trial pumping began, with 72 hours of monitoring still required before returning it to network service. Source and photo: Amal Baladi, 19 Nov 2026
Fixed, as announced in the news. Amal Baladi, 19 Nov 2026
Affected
1
people say this affects them
Watch this issue
Save this to your watchlist and stay updated as it moves.